AC Linear
This function will reduce the AC power output as a linear function of time.
Inputs
Outputs
Algorithm
1.) Loop for all simulation steps for each Block.
a.) The continuous-time function in hours is as follows:
b.) Find the system power due to energization time and degradation for time t.