AC Stepped
This function will reduce the AC power output as a stepped function of time. The AC output of the block is reduced by the linear annual degradation rate at a discrete point in time.
Inputs
Outputs
Algorithm
1.) Loop for all simulation steps for each Block
a.) The discrete-time function in hours is as follows:
b.) Find the system power due to energization time and degradation for time t.