DC Linear
Linear DC degradation function reduces the DC power input to the inverter as a linear function of time by the specified rate from the user.
Inputs
Outputs
Algorithm
1.) Loop for all simulation steps for each Block
a.) The continuous-time function in hours is as follows:
b.) Find the system power due to energization time and degradation for time t.